...
Get in touch

BACS

Tunnel Ventilation System, Riyadh Metro

Overview

Develop execution of Engineering, shop drawing, supply, install, test, and commission a SIL2 TVS to manage smoke heat generated from train/tunnel fires and cool down the temperature in the tunnel for Line 1 (Olaya St) and Line 2 (King Abdullah Road):

17 Deep Underground Stations (Line 1)

6 Shallow Stations (Line 2)

2 Ventilation Shafts (Line 1)

Scope of Work

Design Verification and Detailed Design: Mechanical, Structural, Electrical, and Control Including all shop drawings

FGC has mobilized the needed team (400 manpower at the PEAK):

1- Project Management and Construction Management

2- Logistics Team

3- Installation Team

4- Design Team in all disciplines

5- QA/QC and Safety Teams

6- FGC was able to overcome all the difficulties encountered in the project

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.